Shunyi Campus
Building Type:Office Park,Corporate
Years:2014
Status: Concept Design Completed
Client: Broad Group
Design Area: 129,700 sq.m.
Design Period: 2014
Years:2014
Status: Concept Design Completed
Client: Broad Group
Design Area: 129,700 sq.m.
Design Period: 2014
Prefabrication represents the future of construction industry. Manufacturing buildings using an industrialized and digital method, can greatly increase work efficiency, improve building quality and reduce energy consumption. The Broad Prefab campus would be a living laboratory since architecture here is the real exhibition of the building technology. The auditorium is the activity center and information center, where the academic conference and press can be held.